LGA02 -ROKR - Chocolate Factory - [Assembly Instruction]

Assembly Instruction

FAQ
LGA02 -ROKR - Chocolate Factory
(Click the pictures to view in full size)

Problems of Parts
  1. P1 is a transparent shaft sleeve.

  1. Assemble batteries. Remove only one screw on the battery box.

Functional problems
  1. The ball won’t roll off automatically.

  1. The ball is stuck in this position as shown: check the up and down position of the two boards and the distance of the shaft sleeve on the steel shaft.

  1. After assembling D2, test for smoothness of rotation.

  1. If the overall rotation is not smooth, disassemble it to wax the gear meshing area and the inner side of the bearing as shown.